...
首页> 外文期刊>Arab Oil & Gas >Prequalified Companies Reportedly Threaten to Pull Out of the al-Zour Refinery Project if it Is Retendered
【24h】

Prequalified Companies Reportedly Threaten to Pull Out of the al-Zour Refinery Project if it Is Retendered

机译:据报道,资格预审的公司威胁要撤出al-Zour精炼厂项目,如果重新招标

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

According to the Kuwaiti newspaper Al Rai al-Aam,most of the nine companies that submitted bids by December for work connected with the construction of the 615,000-b/d al-Zour refinery have reportedly informed their respective agents in Kuwait that they are not prepared to submit fresh bids for the project in the event that Kuwait National Petroleum Company (KNPC) issues a new tender or puts back the closing date of the existing tender once again.The bid bonds and bids are valid for a period of three months,i.e.to the middle of March.Al Rai al-Aam pointed out that,after that date,KNPC would face the prospect of the bidders pulling out of the project.
机译:据科威特报纸Al Rai al-Aam称,据报在12月之前投标与建造615,000-b / d al-Zour炼油厂有关的工作的九家公司中的大多数都已通知其各自在科威特的代理商如果科威特国家石油公司(KNPC)发出新的投标书或再次推迟现有投标书的截止日期,则准备为该项目提交新的投标书。投标保证书和投标书的有效期为三个月,即到3月中旬。AlRai al-Aam指出,在那之后,KNPC将面临投标人退出该项目的前景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号