首页> 外文期刊>Construction robotics >Comparison of on-site and off-site robot solutions to the traditional framing and drywall installation tasks
【24h】

Comparison of on-site and off-site robot solutions to the traditional framing and drywall installation tasks

机译:现场和非现场机器人解决方案与传统框架和石膏板安装任务的比较

获取原文
获取原文并翻译 | 示例

摘要

Abstract Given the efforts to automate construction tasks on- and off-site, construction innovation leaders should determine whether robots are beneficial compared to traditional methods. However, we have not found a study comparing on and off-site robots to traditional methods. This paper develops a case study contrasting the impact of on-site drywall placing robots and off-site framing to the traditional framing and drywall installation. Strenuous work reduced from 90 to 57 with the on-site robot and 44 with the off-site robot. Both robots minimized the 3 traditional rework. Prefabrication cut the framing and drywall schedule by 38 and the on-site robot by 23 working 16-h shifts. Added costs included the robot service (50 increase) and the prefabrication logistics (45 increase). Finally, the paper assesses whether the traditional versus single-task robot evaluation method is suitable for off-site prefabrication robots. Limitations included the schedule comparison units, business model adoption, and environmental impacts.
机译:摘要考虑到自动化的努力建设任务和厂外,建设创新的领导人应该确定比传统的机器人是有益的方法。比较传统和非现场的机器人方法。对比现场干墙放置的影响机器人和厂外框架的传统框架和干墙安装。与现场机器人从90减少到57%44%的非现场机器人。减少3%的传统返工。预制框架和干墙安排现场机器人了38%和23%16小时轮班工作。机器人(增加50%)和服务预制物流(增加45%)。本文评估是否传统的对比单任务操作机器人评价方法是合适的对非现场预制的机器人。包括时间表比较单位,业务模型采用和环境影响。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号