首页> 外文期刊>Arab Oil & Gas >Sohar Power Station Has Increased the Sultanate's Generating Capacity by Nearly One-Quarter
【24h】

Sohar Power Station Has Increased the Sultanate's Generating Capacity by Nearly One-Quarter

机译:苏哈尔电站将苏丹国的发电量提高了近一个季度

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Sohar power and water complex,which was the first independent water and power project undertaken by the French company Suez in Oman,has increased the volume of electricity fed into the country's power grid by 23%,the Chief Executive Officer of Suez Energy International (SEI),Mr.Dirk Beeuwsaert,announced on 16 December.Mr.Beeuwsaert was speaking on the occasion of the official inauguration of the complex,whose construction started in 2005 and which entered full commercial operation at the end of May 2007.As regards its water production,the Sohar complex has had an equally large impact,since it has boosted the total output of potable water in the Muscat/Batinah region by 65%.
机译:苏伊士能源国际(Soez Energy International)首席执行官苏哈尔(Sohar)电力和水综合设施是法国苏伊士公司在阿曼开展的首个独立水电项目,已使该国电网的输电量增加了23%。 SEI),Dirk Beeuwsaert先生于12月16日宣布。Beeuwsaert先生是在该综合体正式落成之际发表讲话的,该综合体的建设始于2005年,并于2007年5月全面投入商业运营。供水方面,苏哈尔综合体产生了同样大的影响,因为它使马斯喀特/巴蒂纳地区的饮用水总产量增加了65%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号