首页> 外国专利> METHOD AND INSTALLATION FOR DECREASING THE LOSSES WHEN STARTING AND SHUTTING OFF A THERMAL STATION, AND TO INCREASE THE POWER AVAILABLE AND TO IMPROVE THE CONTROL CAPACITY IN A THERMAL STATION

METHOD AND INSTALLATION FOR DECREASING THE LOSSES WHEN STARTING AND SHUTTING OFF A THERMAL STATION, AND TO INCREASE THE POWER AVAILABLE AND TO IMPROVE THE CONTROL CAPACITY IN A THERMAL STATION

机译:用于减少启动和关闭热站时的损耗并增加可用功率并提高热站中的控制能力的方法和安装

摘要

according to this method, heat, pressure accumulators are incorporated in the steam circuit of the thermal power plant.these batteries are charged by a supply of heat generated in the plant, for example, during the startup or shutdown or during periods of power generation is reduced, and is discharged in a demand for heat, by releasing the accumulated heat in the water steam circuit.the differences in the electrical power supplied by the power plant is compensated by a change of the current to charge or discharge the heat accumulators.in the installation for carrying out the process the accumulators are mounted in shunt with the water side condensing circuit and are connected with the network side, steam, medium pressure superheater channel or water vapor, or catch steam turbine medium and low pressure.
机译:根据这种方法,在热力发电厂的蒸汽回路中装有蓄热,蓄压器。这些电池通过发电厂中产生的热量进行充电,例如在启动或关闭期间或发电期间。通过释放水蒸汽回路中积聚的热量来减少热量并根据需要将其排放出去。通过改变充电或放电蓄热器的电流来补偿发电厂提供的电功率差。用于执行该过程的装置蓄能器与水侧冷凝回路并联安装,并与网络侧,蒸汽,中压过热器通道或水蒸气连接,或捕获蒸汽轮机中低压。

著录项

  • 公开/公告号EP0088756B1

    专利类型

  • 公开/公告日1986-04-02

    原文格式PDF

  • 申请/专利权人 SAARBERGWERKE AKTIENGESELLSCHAFT;

    申请/专利号EP19820900106

  • 发明设计人 SPLIETHOFF HEINZ;

    申请日1981-12-23

  • 分类号F01K3/00;

  • 国家 EP

  • 入库时间 2022-08-22 07:36:02

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号