首页> 外国专利> METHOD AND INSTALLATION FOR DECREASING THE LOSSES WHEN STARTING AND SHUTTING OFF A THERMAL STATION, AND TO INCREASE THE POWER AVAILABLE AND TO IMPROVE THE ADJUSTING CAPACITY IN A THERMAL STATION

METHOD AND INSTALLATION FOR DECREASING THE LOSSES WHEN STARTING AND SHUTTING OFF A THERMAL STATION, AND TO INCREASE THE POWER AVAILABLE AND TO IMPROVE THE ADJUSTING CAPACITY IN A THERMAL STATION

机译:减少热站启动和关闭时的损耗,增加可用功率并提高热站调节能力的方法和安装

摘要

According to this method the pressurized heat accumulators are incorporated into the steam circuit of the power plant. These accumulators are charged by a supply of waste heat produced in the plant, for example during startup or shutdown or during periods of reduced production of electricity, and are unloaded at a greater heat demand , by release of heat accumulated in the water-steam circuit. The differences in the electric power supplied by the unit are offset by a change in the charging current or discharging heat accumulators. In the plant for carrying out the process the batteries are connected in bypass on the water side with the condensation circuit and are connected on the steam side, with the medium-pressure system or the intermediate superheater steam circuit or with steam taken at medium or low pressure turbines.
机译:根据该方法,将加压蓄热器结合到发电厂的蒸汽回路中。这些蓄能器通过在工厂中产生的废热来充电,例如在启动或关闭过程中或发电量减少期间,并通过释放水-蒸汽回路中蓄积的热量而以更大的热量需求卸载。 。由单元提供的电功率的差异被充电电流或放电蓄热器的变化所抵消。在执行该过程的工厂中,电池在水侧与冷凝回路旁路连接,在蒸汽侧,中压系统或中间过热器蒸汽回路或中,低压蒸汽中连接。压力涡轮机。

著录项

  • 公开/公告号EP0088756A1

    专利类型

  • 公开/公告日1983-09-21

    原文格式PDF

  • 申请/专利权人 SAARBERGWERKE AKTIENGESELLSCHAFT;

    申请/专利号EP19820900106

  • 发明设计人 SPLIETHOFF HEINZ;

    申请日1981-12-23

  • 分类号F01K3/00;

  • 国家 EP

  • 入库时间 2022-08-22 10:29:27