...
【24h】

German Res sector faces up to virus fallout

机译:德国房地产部门面临病毒辐射

获取原文
获取原文并翻译 | 示例
           

摘要

German renewable projects are at risk of delay and lost subsidies because of the impacts of the coronavirus, according to industry insiders. Wind and solar photovoltaic (PV) sector participants want the government to extend deadlines for projects awarded capacity under the EEG tender scheme. The coronavirus pandemic means German solar PV projects could face delays, industry association BSW said, adding that large projects could lose subsidies, as the virus pushes back completion dates. Delays may occur in component supply chains, and be exacerbated by construction and administrative staff shortages.
机译:据行业内部人士称,由于冠状病毒的影响,德国可再生项目面临延误和损失补贴的风险。 风能和太阳能光伏(PV)部门参与者希望政府在脑电图招标计划下延长授予能力的项目的截止日期。 BSW行业协会表示,冠状病毒大流行意味着德国太阳能光伏项目可能面临延误,并补充说,随着病毒推迟完成日期,大型项目可能会失去补贴。 组件供应链中可能发生延迟,并因建筑和行政人员短缺而加剧。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号