首页> 外文期刊>Coal Trader >Paringa looks to plug funding gap amid slower ramp-up at Kentucky coal mine
【24h】

Paringa looks to plug funding gap amid slower ramp-up at Kentucky coal mine

机译:Paringa希望在肯塔基煤矿飙升速度速度速度下堵塞资金缺口

获取原文
获取原文并翻译 | 示例
           

摘要

Islamabad—Paringa Resources is looking to raise cash to fund the ramp-up to positive cashflow at its Poplar Grove coal mine, part of the Buck Creek Complex in western Kentucky. The company said September 18 that it has a funding gap due to a slower-than-expected mine ramp-up but expects to be free cash flow positive in February 2020 on a two-unit basis. Paringa entered into a term sheet to grant a 2% gross revenue royalty over the Buck Creek mining complex to Tribeca Global Resources Credit in exchange for $9.0 million. The royalty financing allows the company to resize the second tranche of its $56 million term loan facility from Tribeca to $10 million from $16 million.
机译:伊斯兰堡 - Paringa资源正在寻求筹集现金,以在肯塔基州西部杨树群煤矿的一部分是巴勒拉尔·格罗夫煤矿上的斜坡上的升高现金流。 该公司表示,9月18日表示,由于矿山速度较慢,它具有较慢的矿山速度,但预计将在2月2020年的自由现金流正为双单位。 Paringa签订了一个术语表,以授予2%的收入收入级,以换取Tribeca全球资源信贷额以换取900万美元。 皇室融资允许该公司从Tribeca将其5600万美元的贷款机构的第二次批准大小从1600万美元到1000万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号