【24h】

E. O. Paton bridge is 50

机译:H. Peton Brist Ed 50

获取原文
获取原文并翻译 | 示例
       

摘要

Problems of welded bridge construction, solved under supervision of E. O. Paton, are considered at initial stage of its establishment and, finally, 50 years ago by the construction of unique all-welded bridge across the Dnieper river in Kiev. The ways of assurance of a design service life of all-welded bridges are shown on the basis of basic principles of designing and established main causes of earlier initiation of fatigue cracks in elements of standardized spans, which were used in designing of E.O.Paton bridge. Design solutions of spans and welded connections, eliminating occurrence of secondary stresses and vibrations in them, were recognized determinant. Selection of steel, technology of welding and treatment of welded joints plays an important role in prevention of fractures.
机译:在E. O. Paton的监督下解决的焊接桥梁建设问题在其成立的初始阶段,最后,50年前通过在基辅跨越Dnieper河上的独特全焊桥建造。 基于设计的基本原则和建立了标准化跨度元素中的疲劳裂缝的基本原则,以基本原因显示了所有焊接桥梁设计使用寿命的方法。 跨越焊接连接的设计解决方案,消除了其次要应力和振动的发生,得到了决定因素。 钢材的选择,焊接和焊接接头的处理技术在预防骨折方面发挥着重要作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号