【24h】

E. O. Paton bridge is 50

机译:H.O. Patton队伍是50

获取原文
获取原文并翻译 | 示例
       

摘要

Problems of welded bridge construction, solved under supervision of E. O. Paton, are considered at initial stage of its establishment and, finally, 50 years ago by the construction of unique all-welded bridge across the Dnieper river in Kiev. The ways of assurance of a design service life of all-welded bridges are shown on the basis of basic principles of designing and established main causes of earlier initiation of fatigue cracks in elements of standardized spans, which were used in designing of E.O.Paton bridge. Design solutions of spans and welded connections, eliminating occurrence of secondary stresses and vibrations in them, were recognized determinant. Selection of steel, technology of welding and treatment of welded joints plays an important role in prevention of fractures.
机译:在E.O. Paton的监督下解决的焊接桥梁建设问题在其成立初期就被考虑,最后,在50年前,在基辅的第聂伯河上建造了独特的全焊接桥梁。在设计的基本原理的基础上,给出了保证全焊接桥梁设计使用寿命的方法,并建立了标准跨度中疲劳裂纹提早产生的主要原因,这些方法被用于E.O.Paton桥梁的设计。跨度和焊接连接的设计解决方案可以消除决定性因素,从而消除了其中的次级应力和振动。钢材的选择,焊接技术和焊接接头的处理对防止断裂起着重要的作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号