首页> 外文期刊>Journal of Mines, Metals & Fuels >Management of operations in bord and pillar development using side dump loader: a network planning approach
【24h】

Management of operations in bord and pillar development using side dump loader: a network planning approach

机译:使用侧面转储装载机管理BORD和Pillar开发的操作:网络规划方法

获取原文
获取原文并翻译 | 示例
           

摘要

This paper discusses an approach for preparation of optimal sequence of operations for bord and pillar (B & P) development using side dump loader (SDL) by network planning, method. A sequencing model is developed which consists of two parts, first part makes an estimate of time requirement of each operation in a face cycle viz. drilling, blasting, supporting and loading by simulation and in second part, operations are arranged in proper sequence as per availability' of crews and SDLs to minimise slack time.
机译:本文讨论了通过网络规划,方法使用侧倾装载机(SDL)制备BORD和PALERAR(B&P)开发的最佳操作顺序的方法。 开发了由两个部分组成的测序模型,第一部分是面部循环viz中每个操作的时间要求估计。 通过模拟和第二部分钻探,爆破,支持和加载,操作按照可用性的序列排列的机组人员和SDL的顺序排列,以最小化松弛时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号