首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Total to rebid Angolan deep to catch falling costs...
【24h】

Total to rebid Angolan deep to catch falling costs...

机译:总计愿意深陷安哥拉以赶上下降的成本...

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Total is to rebid for the Zinia Phase 2 project off Angola in the third quarter as it tries to take advantage of falling development costs. Doris Engineering completed the front end engineering design for the project in Block 17 last year. It is to be a tie-back to the existing FPSO at the Pazflor project which is taking in crude from the Perpetua, Acacia, Zinia and Hortensia fields which lie in water depths of 1,969-3,937ft (600-1,2Q0m).
机译:道达尔将拒绝在第三季度参与安哥拉的Zinia二期项目,因为它试图利用不断下降的开发成本。去年,多丽丝工程公司完成了该项目的前端工程设计,位于第17区块。这是对Pazflor项目现有FPSO的支持,该项目从Perpetua,Acacia,Zinia和Hortensia油田开采原油,这些油田的水深为1,969-3,937ft(600-1,2Q0m)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号