【24h】

Total prepares Angola deep wildcat

机译:总准备安哥拉深野猫

获取原文
获取原文并翻译 | 示例
       

摘要

Total said it is preparing to drill a deepvvater wildcat in the Lower Congo Basin in Angola as it confirmed first oil from the Kaombo Sul project. Kaombo Sul is the second pole in Block 32 and will add another 115,000 b/d of oil production with gas to head to the Angola LNG plant. This achievement demonstrates once again Total's commitment to Angola, as the group develops short cycle projects on Block 17 in parallel and prepares to drill an exploration well on Block 48," said Total's head of E&P,Arnaud Breuillac.
机译:总计表示,它准备在安哥拉的下刚果盆地钻一个深vVerate野猫,因为它确认了来自Kaombo Sul项目的首批油。 Kaombo Sul是块32中的第二杆,将另外115,000b / d用气体进入安哥拉液化植物。 这一成就再次表现出对安哥拉的承诺,因为本集团并行地在街区17上开发短周期项目,并准备在框48上钻井勘探,“E&P,Arnaud Breuillac的总部说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号