【24h】

Nigerian Aje back on track after cash raise

机译:筹集现金后,尼日利亚阿杰重回正轨

获取原文
获取原文并翻译 | 示例
           

摘要

Negotiations for the Aje development off Nigeria may soon speed up again with final awards expected shortly after the partners raised more cash. The final investment decision on the US $220m Yinka Fo-lawiyo operated project in shallow water in OML 113 was taken last October with Rubicon being awarded the FPSO. The final two major contracts left open are for the drilling rig - which was originally due to be awarded in February - and the operations and maintenance of the FPSO.
机译:在合作伙伴筹集到更多资金后不久,有关尼日利亚以外的Aje开发的谈判可能很快会加速,并有望获得最终奖项。去年10月,在OML 113浅水区的2.2亿美元的Yinka Fo-lawiyo运营项目中做出了最终投资决定,Rubicon被授予FPSO。剩下的最后两个主要合同是钻机(原定于2月授予)以及FPSO的运​​营和维护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号