首页> 外文会议>IEEE PES/IAS PowerAfrica Conference >Technical Analysis of Barriers to Raising the Power Delivery Ceiling in Nigeria
【24h】

Technical Analysis of Barriers to Raising the Power Delivery Ceiling in Nigeria

机译:尼日利亚提高电力输送上限的障碍的技术分析

获取原文

摘要

On December 18th 2017, an all-time high level of power delivery of 5.2GW was achieved in Nigeria, providing a new data-point on the proven physical wheeling capability of the system and prompting discussion on how to exceed the record. This paper presents statistical analysis based on the first-ever investigation of hourly, spatially disaggregated load and generation data from Nigeria over a full year, and load flow analysis based on the record performance day. The paper also explains relevant features of the local power sector. The analysis quantifies how performance has improved in 2017, but also how differing operational choices of the parties involved, and physical distribution system technical limitations tend to limit the increase of delivered energy. Physical transmission system limits suggest a regional voltage limit would be reached at 5.45GW, but that by changing distributed power, the total load could be extended to 5.7GW before thermal limits are reached on some infrastructure.
机译:2017年12月18日,尼日利亚实现了5.2GW的历史最高水平的电力输送,为系统已证明的实际轮转能力提供了新的数据点,并引发了关于如何超越记录的讨论。本文基于对尼日利亚全年的按小时,空间分解的负荷和发电数据进行的首次调查,以及基于记录运行日的负荷流分析,进行了统计分析。本文还解释了当地电力部门的相关特征。该分析量化了2017年的绩效改善情况,以及相关方的不同运营选择以及物流系统的技术局限性如何限制交付能源的增加。物理传输系统的限制表明,区域电压限制将达到5.45GW,但是通过更改分布式电源,在某些基础设施达到热限制之前,总负载可以扩展到5.7GW。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号