【24h】

Exxon readies Equatorial Guinea tender

机译:埃克森美孚准备赤道几内亚招标

获取原文
获取原文并翻译 | 示例
           

摘要

ExxonMobil is preparing to invite expressions of interest for repair and upgrade to the floating production unit (FPU) on the Zafiro field off Equatorial Guinea. Production first started from the field in Block B back in 1996 via the Zafiro Producer FPSO. The US major quickly discovered the potential for production upside and Oceaneering worked as project manager for the Phase 2 FPSO upgrade which lasted through three West African construction seasons until 1999. The Oceaneering work scope covered all aspects of engineering, procurement fabrication and installation to outfit the vessel for a production life of 15 years with a contract value of around LIS $230m.
机译:埃克森美孚(ExxonMobil)正准备邀请有兴趣的人进行维修,并升级到赤道几内亚Zafiro油田的浮式生产装置(FPU)。早在1996年,Zafiro生产商FPSO就从B区块的现场开始生产。这名美国少校迅速发现了生产的潜力,Oceaneering担任了FPSO第二阶段升级的项目经理,该升级持续了三个西非建筑季节,直到1999年。Oceaneering的工作范围涵盖了工程,采购制造和安装的各个方面,以适应该船的生产寿命为15年,合同价值约为2.3亿里拉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号