首页> 外文期刊>World pipelines >Over 50% of TAP pipes have been laid in Greece
【24h】

Over 50% of TAP pipes have been laid in Greece

机译:超过50%的龙头管道已经铺设在希腊

获取原文
获取原文并翻译 | 示例
           

摘要

The construction progress of the Trans Adriatic pipeline (TAP) was presented by TAP AG's Country Manager for Greece Katerina Papalexandri at the 2nd Thessaloniki Summit, held on 5 - 6 October at the loannis Vellidis Congress Centre. In the context of 'the new energy map in the region' panel, Papalexandri. noted the importance of the project for Greece and the wider area of southeast Europe, as well as the continent as a whole. She also referred to the steady progress - well within schedule and on track - of works in all three northern Greek prefectures traversed by the pipeline.
机译:The Trans Adriatic管道(Tap)的施工进度由Tap Ag的国家经理在10月5日至6日在Loannis Vellidis Congress Center举行的第2届塞萨洛尼基首脑会议上举行的希腊Katerina Papalexandri。 在“地区新能源地图”小组的背景下,Papalexandri。 注意到对希腊和东南欧更广阔的地区的项目以及整个大陆的重要性。 她还提到了稳步发展 - 良好的进度 - 在附表和轨道上,在由管道穿过的所有三个希腊县的作品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号