...
首页> 外文期刊>Power: The Magazine of Power Generation and Plant Energy Systems >Digitization Drives Efficiency at Turkish Coal Plant
【24h】

Digitization Drives Efficiency at Turkish Coal Plant

机译:数字化推动土耳其煤炭厂的效率

获取原文
获取原文并翻译 | 示例
           

摘要

The CENALTES, or Karabiga, power plant in Turkey is a model for the use of high-performance technology and digital software to power an ultrasupercritical coal-fired facility. Coal continues to be the primary source of power generation in Turkey, even as renewable power increases its market share. The country considers coal a critical source of reliable baseload power, and officials recognize the need to ensure the nation's coal plants operate with high efficiency, flexibility, and with limited environmental impact. CENAL TES, also known as Karabiga Steam Power Plant (SPP), is the country's first ultrasupercritical (USC) coal-fired generation facility. Karabiga also is Turkey's first digital steam plant, thanks to a multi-year service agreement signed with General Electric (GE) in 2019. The plant is owned by CENAL Elektrik Uretim A.S., a joint venture between Cengiz Holding and Alarko Holding, and located on the Marmara Sea, in Canakkale province.
机译:土耳其的Cenaltes或Karabiga,火鸡的发电厂是使用高性能技术和数字软件来供电超批量燃煤设施的模型。 煤炭仍然是土耳其发电的主要来源,即使可再生能力增加其市场份额。 该国考虑煤炭成为可靠的基础电力的关键来源,官员认识到需要确保全国煤炭厂以高效率,灵活性和有限的环境影响。 Cenal TES,也称为Karabiga Steam Power Plation(SPP),是该国的第一个超人批判(USC)燃煤产生设施。 由于2019年通过电气(GE)签署的多年服务协议,卡拉比亚也是土耳其的第一个数字蒸汽厂。该工厂由Cenal Elektrik Uretim拥有,作为Cengiz控股和Alarko Holding的合资企业,并位于 马尔马拉海,加拿大盖尔省。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号