In southwestern China, the stability of high-steep slopes in large-scale hydropower projects has become a key technical challenge that constrains the safety of construction and operation. Based on a geological survey of the large-scale rock block in the Jinping-I Hydropower Station left bank, the entire system of the dam and its abutment slope is defined as the study subject. The mechanisms of interaction between the arch dam and the abutment slope during the construction stage, the impoundment stage and the structural plane strength-weakening stage are investigated using physical model tests. (1) During the excavation stage, the early-stage excavation has a significant impact on the huge rock block, whereas the impact of later-stage excavation is relatively small. (2) During the impoundment stage, the dam foundation is under hydraulic load. Therefore, the huge rock block moves away from the slope due to the arch thrust. (3) During the structural plane strength-weakening stage, both sides of the structural planes develop a relative displacement, and the massive rock block slips slightly. Moreover, the strain of the dam is slightly different from the situation in the normal impoundment stage. The majority of the downstream plane is under tension, indicating that a decline in the bedrock strength of the left bank dam abutment results in deformation of the dam towards the mountain body, the riverbed and the top part of the dam crest.
机译:在中国西南部,大型水电项目中高陡坡的稳定已成为限制建设和运营安全的关键技术挑战。基于金平-I水电站左岸的大型岩石块的地质调查,大坝的整个系统及其基台斜率被定义为研究主题。使用物理模型试验研究了拱坝和抵靠斜坡之间的相互作用机制,蓄水阶段和结构平面强度弱化阶段。 (1)在挖掘阶段,早期挖掘对巨大的岩石块产生了重大影响,而后期挖掘的影响相对较小。 (2)在蓄水期间,坝基在液压负荷下。因此,由于拱形推力,巨大的岩石块远离斜面。 (3)在结构平面强度弱化阶段,结构平面的两侧发育相对位移,略微岩石块滑动。此外,大坝的应变与正常蓄积阶段的情况略有不同。下游飞机的大部分都处于紧张状态,表明左岸坝坝坝的基岩强度下降导致大坝的变形朝向山体,河床和大坝顶部的顶部。

著录项

  • 来源
  • 作者单位

    State Key Laboratory of Geomechanics and Geotechnical Engineering Institute of Rock and Soil Mechanics Chinese Academy of Sciences;

    State Key Laboratory of Geomechanics and Geotechnical Engineering Institute of Rock and Soil Mechanics Chinese Academy of Sciences;

    College of Civil Engineering and Architecture China Three Gorges University;

    MBLEM Department of Engineering Science University of Oxford;

    State Key Laboratory of Geomechanics and Geotechnical Engineering Institute of Rock and Soil Mechanics Chinese Academy of Sciences;

    State Key Laboratory of Geomechanics and Geotechnical Engineering Institute of Rock and Soil Mechanics Chinese Academy of Sciences;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 岩石(岩体)力学及岩石测试;
  • 关键词

    Slope; Stability; Jinping-I Dam; Physical model test; Hydropower station;