The seepage field for a diversion tunnel with high pressure in the Coca Codo Sinclair hydroelectric project is investigated using finite difference algorithms during periods of construction completion, operation and overhaul. The transient seepage calculation using FLAC(3D) is verified by a one-dimensional confined flow problem. The equivalent permeability coefficient of the lining, for which cracks are considered, is characterised with empirical formulas. The pressures of the internal and external surfaces of the lining and the external surface of the consolidation grouting region in each period are calculated. The maximum pressure difference between the lining region and the grouted region for each period are obtained. The effect of emptying speed on the seepage field in the emptying period is also discussed.
机译:在施工完工,运营和大修期间,使用有限差分算法研究了COCA Codo Sinclair水力电路中具有高压的转移隧道的渗流场。 使用FLAC(3D)的瞬态渗漏计算通过一维限制流问题验证。 考虑裂纹的衬里的等同渗透系数,其特征在于具有经验性公式。 计算衬里的内部和外表面的压力和每个时段中的固结灌浆区域的外表面。 获得衬里区域和每个时段的灌浆区域之间的最大压力差。 还讨论了排空时段中排空速度对渗流场的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号