首页> 外文期刊>International Journal of Performability Engineering >A Preventive Maintenance Model Subject to Sequential Inspection for a Three-Stage Failure Process
【24h】

A Preventive Maintenance Model Subject to Sequential Inspection for a Three-Stage Failure Process

机译:一种预防性维护模型对三级故障过程进行顺序检查

获取原文
获取原文并翻译 | 示例
           

摘要

For a system subject to gradual degradation, it can be in one of three different states: normal, minor defective, or severe defective stages, which can overall be referred to as a three-stage failure process. For this system, periodic inspection may not be the most ideal policy. Fewer inspections will lead to lower costs if the system is in the normal stage, but if the system is in the defective stage, frequent inspections are recommended to prevent failure. Therefore, it may be more economical to take the sequential time T_j(j=0,1,2,...) as the inspection interval. In view of this, a preventive maintenance (PM) model subject to sequential inspection for a three-stage failure process is proposed. Two-level sequential inspections, postponed maintenance and opportunistic maintenance (OM), are introduced into the PM model. The minor inspection is taken at the successive time S_j(j=0,1,2,...), where S_j=∑{top}j{bottom}(k=0) T_k, T_0,=0, and S_0=0. Minor inspection is an imperfect inspection that can identify the minor defective stage with a certain probability but can reveal other two stages completely. The nth major inspection is taken to substitute for the A_nth (n=0,1,2,...) minor inspection, where A_n=∑{top}n{bottom}(k=0) N_k, N_0=0, and A_0=0. Major inspection is a perfect inspection that can distinguish the state of the system perfectly. Once the severe defective stage is identified, the inspection is stopped and the maintenance action is postponed to the next OM if the time to the next OM is less than a threshold level; otherwise, the system is maintained immediately. A numerical example is given to demonstrate the proposed model by comparing with other models and analysing the influence of the parameters on the expected cost.
机译:对于逐渐降解的系统,它可以是三种不同状态之一:正常,小缺陷或严重缺陷阶段,可以整体被称为三级故障过程。对于该系统,定期检查可能不是最理想的政策。如果系统处于正常阶段,则更少的检查将导致成本降低,但如果系统处于缺陷阶段,则建议频繁检查以防止失败。因此,将顺序时间T_J(j = 0,1,2,...)作为检查间隔进行序贯时间t_j(j = 0,1,2,...)可能更经济。鉴于此,提出了一种预防性维护(PM)模型对三级故障过程进行连续检查。两级顺序检查,推迟到PM型号的延期维护和机会维护(OM)。在连续的时间S_J(j = 0,1,2,......)处进行微小检查,其中s_j =σ{top} j {bottom}(k = 0)t_k,t_0,= 0和s_0 = 0。轻微检查是一种不完美的检查,可以通过一定的概率识别小缺陷阶段,但可以完全揭示其他两个阶段。第n个重大检查被采用A_NTH(n = 0,1,2,...)次要检查,其中A_N =Σ{TOP} n {底部}(k = 0)n_k,n_0 = 0,和a_0 = 0。主要检查是一个完美的检查,可以完美地区分系统状态。一旦识别出严重的缺陷阶段,如果下一个OM的时间小于阈值水平,则停止检查检查并将维护动作推迟到下一个OM;否则,系统立即维护。通过与其他模型与其他模型进行比较,给出数值示例来演示所提出的模型,并分析参数对预期成本的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号