首页> 外文期刊>International Journal of Operational Research >Net present value maximisation of integrated project scheduling and material procurement planning
【24h】

Net present value maximisation of integrated project scheduling and material procurement planning

机译:综合项目调度和材料采购计划的净值最大化

获取原文
获取原文并翻译 | 示例
           

摘要

A mixed-integer programming model is developed in this paper to consider simultaneous planning of project scheduling and material procurement problem as an efficient approach to improve project costs. The proposed formulation provides the model with the possibility to procure materials from a number of suppliers each offering a distinctive all-unit discount method. The purpose of the mathematical model is to develop schedules with the best net present value in order to guarantee successful completion of the project. We have applied a genetic algorithm to solve the problem, whose key factors are tuned by the Taguchi method. It is discussed how to generate initial feasible solutions as a preprocessing method to start the solution algorithm. Finally, the efficiency and applicability of the model is tested by a different set of category-based instances.
机译:本文开发了一种混合整数编程模型,以考虑对项目调度和材料采购问题的同时规划,作为提高项目成本的有效方法。 该建议的制定提供了模型,可以从许多供应商那里采购材料,每个供应商都提供了独特的全单元折扣方法。 数学模型的目的是制定具有最佳净现值的时间表,以保证成功完成项目。 我们已经应用了一种遗传算法来解决问题,其关键因素由Taguchi方法进行调整。 讨论了如何生成初始可行解决方案作为启动解决方案算法的预处理方法。 最后,模型的效率和适用性由不同的基于类别的类别进行测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号