首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >Shell asks for more time on Nigerian Bonga SWA
【24h】

Shell asks for more time on Nigerian Bonga SWA

机译:壳牌要求在尼日利亚邦卡SWA上有更多的时间

获取原文
获取原文并翻译 | 示例
       

摘要

The remaining bidders on Shell's US $10 Bn Bonga Southwest/Aparo (BSWA) project off Nigeria continue to be frustrated with the company now asking for more time - again. The operator was timetabled to have opened commercial bids long ago but, as previously revealed by AOG, unexpectedly returned and asked for further technical clarifications from FPSO bidders including details on local content. These were submitted at the start of this month.
机译:贝壳的US $ 10 BN Bonga Southwest / Aparo(BSWA)项目的剩余投标人继续令人沮丧,而现在又令我们询问更多时间 - 再次询问。 运营商是时候开始了商业出价的时间表,但是,正如AOG所揭示的那样,意外地返回并要求来自FPSO投标人的进一步技术澄清,包括本地内容的详细信息。 这些是在本月初提交的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号