首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >ADX still in shallow appraisal financing talks after reserves cut
【24h】

ADX still in shallow appraisal financing talks after reserves cut

机译:ADX仍然在储备后浅谈融资融资谈判

获取原文
获取原文并翻译 | 示例
       

摘要

ADX said it is still in discussions "with a number of parties" about financing an appraisal well on its shallow water Dougga project off Tunisia although reserves have been cut. The Australian company is trying to push through a US $930m 100 MMcf/d project involving a 45km pipeline to shore to a new gas plant. First it has a contract for the Noble Globetrotter II drillship for an appraisal well on the discovery in the first quarter of next year. The field is in around 655ft (200m) of water in the Kerkouane permit. Before it is able to do this ADX must have funding in place for the US $24m drilling contract.
机译:Adx表示,它仍然在讨论“与许多缔约方”关于在其浅水Dougga项目关闭突尼斯融资的评估,尽管储备已被削减。 澳大利亚公司正试图推动涉及45公里的岸边的930亿美元的MMCF / D项目到新的煤气厂。 首先,它对明年第一季度的发现良好的贵族GlobetroTer II练习的合同。 该领域在Kerkouane许可证中占地面积在655英尺(200米)的水中。 在能够做到这一点之前,ADX必须为2400万美元的钻井合同提供资金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号