首页> 外文期刊>Social science and medicine >Performance management in healthcare: performance indicator development, task uncertainty, and types of performance indicators.
【24h】

Performance management in healthcare: performance indicator development, task uncertainty, and types of performance indicators.

机译:医疗保健中的绩效管理:绩效指标开发,任务不确定性和绩效指标类型。

获取原文
获取原文并翻译 | 示例
           

摘要

In healthcare, performance indicators are increasingly used to measure and control quality and efficiency of care-providing teams. This article demonstrates that when controllability is emphasized during indicator development, the level of task uncertainty influences the type of resulting performance indicators. We report findings from a field study in a medical rehabilitation centre in The Netherlands, where four low task uncertain teams ('hand trauma', 'heart failure', 'amputation', 'chronic pain'), and four high task uncertain teams ('children with developmental coordination disorders (DCD)', 'parkinson's disease', 'young children (0-4 years) with developmental disorders', and 'acquired brain injuries') participated in the development of performance indicators using the Productivity Measurement and Enhancement System (ProMES) method. Results show that teams higher on task uncertainty developed relatively more process indicators compared to outcome indicators, whereas the reverse was true for teams lower on task uncertainty. Additionally, process indicators developed by high task uncertain teams were more of a problem solving nature than process indicators developed by low task uncertain teams, which had a more procedural character. The study expands existing knowledge by providing a framework which explicates the task processes to be executed under different levels of task uncertainty, and in line with that appropriate performance indicators for healthcare teams.
机译:在医疗领域,性能指标越来越多地用于测量和控制质量和护理提供团队的效率。本文演示,当控制性指标制定过程中强调,任务不确定性的程度影响造成的性能指标的类型。我们在荷兰,在那里四个低任务不确定队(“手外伤”,“心脏衰竭”,“截肢”,“慢性疼痛”)和四个高任务不确定队(医疗康复中心报告从一个领域的研究结果“有发展性协调障碍(DCD)的孩子”,“帕金森氏病”,“幼儿(0-4岁)发育障碍”和“后天脑损伤”)参加的绩效指标使用效率测量和增强发展系统(PROMES)方法。结果表明,在任务不确定性较高的团队开发出比较多的过程指标相比,结果指标,而相反的是真实的团队对任务的不确定性降低。此外,通过较高的任务不确定的团队开发的工艺指标较多的一个问题的解决自然比低任务不确定队,其中有一个更程序性开发的工艺指标。该研究通过扩展提供了一个框架,explicates下不同级别的任务不确定性的要执行的任务的过程,并与医疗保健团队,合适的性能指标线现有的知识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号