首页> 外文期刊>Social science and medicine >Performance management in healthcare: performance indicator development, task uncertainty, and types of performance indicators.
【24h】

Performance management in healthcare: performance indicator development, task uncertainty, and types of performance indicators.

机译:医疗保健中的绩效管理:绩效指标制定,任务不确定性和绩效指标类型。

获取原文
获取原文并翻译 | 示例
           

摘要

In healthcare, performance indicators are increasingly used to measure and control quality and efficiency of care-providing teams. This article demonstrates that when controllability is emphasized during indicator development, the level of task uncertainty influences the type of resulting performance indicators. We report findings from a field study in a medical rehabilitation centre in The Netherlands, where four low task uncertain teams ('hand trauma', 'heart failure', 'amputation', 'chronic pain'), and four high task uncertain teams ('children with developmental coordination disorders (DCD)', 'parkinson's disease', 'young children (0-4 years) with developmental disorders', and 'acquired brain injuries') participated in the development of performance indicators using the Productivity Measurement and Enhancement System (ProMES) method. Results show that teams higher on task uncertainty developed relatively more process indicators compared to outcome indicators, whereas the reverse was true for teams lower on task uncertainty. Additionally, process indicators developed by high task uncertain teams were more of a problem solving nature than process indicators developed by low task uncertain teams, which had a more procedural character. The study expands existing knowledge by providing a framework which explicates the task processes to be executed under different levels of task uncertainty, and in line with that appropriate performance indicators for healthcare teams.
机译:在医疗保健领域,绩效指标越来越多地用于衡量和控制护理团队的质量和效率。本文证明,在指标开发过程中强调可控制性时,任务的不确定性水平会影响最终绩效指标的类型。我们报告了在荷兰医疗康复中心进行的一项实地研究的结果,该中心有四个低任务不确定性团队(“手部创伤”,“心力衰竭”,“截肢”,“慢性疼痛”)和四个高任务不确定性团队( “患有发育协调障碍(DCD)的儿童”,“帕金森氏病”,“患有发育障碍的年轻儿童(0-4岁)和'获得性脑损伤”)使用生产率测量和增强功能参与了绩效指标的制定系统(ProMES)方法。结果表明,与结果指标相比,任务不确定性较高的团队开发了相对更多的过程指标,而任务不确定性较低的团队则相反。另外,由高任务不确定性团队开发的过程指标比具有低任务性的低任务不确定团队开发的过程指标更具解决问题的性质。该研究通过提供一个框架来扩展现有知识,该框架阐明了在不同级别的任务不确定性下要执行的任务流程,并与针对医疗团队的适当绩效指标相一致。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号