首页> 外文期刊>Social science and medicine >Performance management in healthcare: performance indicator development, task uncertainty, and types of performance indicators.
【24h】

Performance management in healthcare: performance indicator development, task uncertainty, and types of performance indicators.

机译:医疗保健中的绩效管理:绩效指标开发,任务不确定性和绩效指标类型。

获取原文
获取原文并翻译 | 示例
           

摘要

In healthcare, performance indicators are increasingly used to measure and control quality and efficiency of care-providing teams. This article demonstrates that when controllability is emphasized during indicator development, the level of task uncertainty influences the type of resulting performance indicators. We report findings from a field study in a medical rehabilitation centre in The Netherlands, where four low task uncertain teams ('hand trauma', 'heart failure', 'amputation', 'chronic pain'), and four high task uncertain teams ('children with developmental coordination disorders (DCD)', 'parkinson's disease', 'young children (0-4 years) with developmental disorders', and 'acquired brain injuries') participated in the development of performance indicators using the Productivity Measurement and Enhancement System (ProMES) method. Results show that teams higher on task uncertainty developed relatively more process indicators compared to outcome indicators, whereas the reverse was true for teams lower on task uncertainty. Additionally, process indicators developed by high task uncertain teams were more of a problem solving nature than process indicators developed by low task uncertain teams, which had a more procedural character. The study expands existing knowledge by providing a framework which explicates the task processes to be executed under different levels of task uncertainty, and in line with that appropriate performance indicators for healthcare teams.
机译:在医疗保健中,绩效指标越来越多地用于衡量和控制提供的小组的质量和效率。本文表明,当在指标开发期间强调可控性时,任务不确定性的水平会影响所产生的绩效指标的类型。我们从荷兰医疗康复中心的实地研究报告调查结果,其中四个低任务不确定的团队('手创伤','心力衰竭','截肢','慢性疼痛')和四个高任务不确定团队( '具有发育协调障碍(DCD)的儿童','帕金森病',“幼儿(0-4岁),发育障碍”和“获得的大脑伤害”)参与了使用生产率测量和增强的绩效指标的发展系统(PROMES)方法。结果表明,与结果指标相比,任务不确定性的团队更高的工艺指标,而逆转对于减少任务不确定性的团队则为真实。此外,高级任务不确定的团队开发的流程指标更多地是解决性质而不是低任务不确定团队开发的工艺指标,这具有更加程序性的性格。该研究通过提供一个框架来扩展现有知识,该框架阐述了在不同级别的任务不确定性下执行的任务流程,以及符合保健小组的适当性能指标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号