...
首页> 外文期刊>European Offshore Petroleum Newsletter >UK Huntington decom plan tabled
【24h】

UK Huntington decom plan tabled

机译:英国亨廷顿裁判计划提交

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Premier Oil has submitted its decommissioning pro- gramme for the float-off of the Huntington field Floating Production, Storage and Offloading (FPSO) in the UK North Sea to the UK authorities. The Premier-operated Huntington field lies in Block 22/14b in the Central North Sea, around 230km from Aberdeen, 28km from the UK/Norway median line at a water depth of around 89m (292ft). Production started in 2013. Produced oil is stored in cargo oil tanks and exported using shuttle tankers. Dehydrated gas is also exported to shore via the Central Area Transmission System.
机译:总理石油已将其退役的浮动,以便在英国北海浮动生产,储存和卸载(FPSO)到英国当局。 距离北海中央北海的街区22 / 14B距离酒店距离阿伯丁约有230公里,距离英国/挪威中位数约为89米(292英尺)。 生产于2013年开始。生产的油包装在货物油箱中,并使用梭式船用船出口。 脱水气体也通过中央区域传动系统出口到岸边。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号