In this paper dynamic experiments on the Antoing Bridge located on the high-speed railway line between Paris and Brussels are reported. The experiments were co-operatively carried out by the Northern Jiaotong University from China, the Catholic University of Leuven, the Free University of Brussels and the Belgium Railway Company NMBS-SNCB from Belgium. The bridge is composed of multi-span simply supported PC girders with spans of 50 in and U-shaped sections. The loads are the high-speed Thalys trains with articulated vehicles. The speeds of the Thalys trains were between 265 and 310 km/h. In the experiments, the dynamic responses of the bridge such as the deflections, the accelerations and the strains that were measured by a laser velocity displacement transducer accelerometers and strain gauges, respectively. Many useful results have been obtained from the analysis of the recorded data. The tests and the measured results can be a reference for the study and the design of high-speed railway bridges. (C) 2003 Elsevier Ltd. All rights reserved. [References: 7]
展开▼
机译:本文报道了位于巴黎和布鲁塞尔之间的高速铁路线上的安托桥的动态实验。这些实验是由中国北方交通大学,鲁汶天主教大学,布鲁塞尔自由大学和比利时比利时铁路公司NMBS-SNCB合作进行的。桥梁由跨度为50的U型截面的跨度简单支撑的PC梁组成。负载是装有铰接车辆的高速Thalys火车。 Thalys列车的速度介于265至310 km / h之间。在实验中,桥梁的动态响应,例如挠度,加速度和应变,分别由激光速度位移传感器加速度计和应变仪测量。通过对记录数据的分析已经获得了许多有用的结果。试验和实测结果可为高速铁路桥梁的研究和设计提供参考。 (C)2003 Elsevier Ltd.保留所有权利。 [参考:7]
展开▼