首页> 外文期刊>Journal of Petroleum Technology >Optimization Delivers ERD Performance Boost—Sakhalin Island
【24h】

Optimization Delivers ERD Performance Boost—Sakhalin Island

机译:优化提供ERD性能提升—萨哈林岛

获取原文
获取原文并翻译 | 示例
           

摘要

Many performance-enhancement initiatives were used by the operator of the Sakhalin-I project in drilling and completing the extended-reach-drilling (ERD) program at the Odoptu field, Sakhalin Island, Russia. The initial seven-well ERD program was expanded to nine wells, including the world-record Well OP-11. The operator's redesign philosophy to remove limiters from the drilling process resulted in significant performance improvements in all areas of drilling and completion operations.
机译:Sakhalin-I项目的运营商在俄国萨哈林岛的Odoptu油田进行钻探和完成扩展钻进(ERD)计划时,使用了许多提高性能的措施。最初的7井ERD计划已扩大到9井,其中包括世界纪录的OP-11井。操作员重新设计的理念是从钻井过程中取消限制器,从而在钻井和完井作业的所有领域中都显着提高了性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号