首页> 外文期刊>Zeus liquefied natural gas report >E.ON remains committed to Italy regas
【24h】

E.ON remains committed to Italy regas

机译:E.ON仍致力于意大利加气

获取原文
获取原文并翻译 | 示例
           

摘要

RON remains committed to building an LNG import terminal off the northwest coast of Italy, Reuters reported. Overcapacity in the area has threatened to mothball some gas projects. E.ON and Italian regional utility Iren plan to build a floating storage regasification unit 12 miles off the Tuscan coast by converting an LNG carrier. The OLT Offshore LNG Toscana plant will cost around US$782 million and have an annual capacity of 3.75 billion cubic meters. Some observers have expressed concerns given rising costs, uncertainty over gas supply and falling Italian consumption, which fell 3 percent in 2012. "There's always overcapacity sometimes but infrastructure is not
机译:据路透社报道,RON仍致力于在意大利西北海岸附近建设LNG进口站。该地区的产能过剩威胁着搁置一些天然气项目。 E.ON和意大利地区公用事业公司Iren计划通过改装液化天然气运输船,在托斯卡纳海岸12英里外建造一个浮式储气化装置。 OLT海上LNG Toscana工厂的造价约为7.82亿美元,年产能为37.5亿立方米。一些观察家对成本上涨,天然气供应不确定性和意大利消费下降(2012年下降了3%)表示担忧。“有时总会出现产能过剩,但基础设施并没有

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号