...
首页> 外文期刊>Zeus liquefied natural gas report >Shell begins major construction on Prelude FLNG project
【24h】

Shell begins major construction on Prelude FLNG project

机译:壳牌开始进行Prelude FLNG项目的重大建设

获取原文
获取原文并翻译 | 示例

摘要

Shell recently celebrated the cutting of first steel for the game-changing Prelude floating LNG (FLNG) facility's substructure with joint venture participants, Inpex and KOGAS, and lead contractor, the Technip Samsung Consortium, at Samsung Heavy Industries' Geoje shipyard in South Korea. Shell's Projects & Technology Director Matthias Bichsel commented: "We are cutting 7.6 tonnes of steel for the Prelude floating liquefied natural gas facility today, but in total, more than 260,000 tonnes of steel will be fabricated and assembled for the facility. That's around five times the amount of steel used to build the Sydney Harbour Bridge. Today's ceremony marks a major milestone in this project, when the innovative thinking and new technology and engineering solutions which will make FLNG possible begin to be realized."
机译:壳牌公司最近与合资企业Inpex和KOGAS以及主要承包商Technip三星财团在韩国三星重工业的巨济造船厂庆祝了改变游戏规则的Prelude浮动LNG(FLNG)设施的下部结构的第一批钢材的切割。壳牌公司的项目与技术总监Matthias Bichsel表示:“我们今天为Prelude浮动液化天然气工厂削减了7.6吨钢材,但总计将为该工厂装配和组装超过260,000吨钢材。这大约是原来的五倍。今天的典礼标志着该项目的一个重要里程碑,当使FLNG成为可能的创新思维,新技术和工程解决方案开始实现时。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号