首页> 外文期刊>Hydrocarbon Processing >Use root cause analysis to examine failure of a cooling water pump
【24h】

Use root cause analysis to examine failure of a cooling water pump

机译:使用根本原因分析来检查冷却水泵的故障

获取原文
获取原文并翻译 | 示例
           

摘要

Most plants have a bad-actor elimination program, but sometimes operators fall into the trap of normalization of deviation. Normalization of deviation is a long-term phenomenon in which a lower standard of performance becomes the accepted norm; when that occurs, the root causes of failures remain undetected. This case study focuses on a 250-hp steam-turbine-driven cooling water pump in one of Suncor Energy Inc.'s plants in Canada. The plant had four identical vertical cooling water pumps, of which three were operated and one was kept as a spare. One of the pumps was steam-turbine-driven, and the other three pumps were electric-motor-driven. From installation in 1982, the steam-turbine-driven pump remained a bad actor for 24 years, with a mean time between failures (MTBF) of approximately 1 month, whereas the electric-motor-driven cooling water pumps had an MTBF of 60 months.
机译:大多数工厂都有消除不良因素的计划,但有时操作员会陷入偏差归一化的陷阱。偏差归一化是一种长期现象,在这种情况下,较低的性能标准成为公认的准则;当这种情况发生时,故障的根本原因仍然未被发现。本案例研究的重点是在Suncor Energy Inc.在加拿大的一家工厂中使用250 hp的蒸汽轮机驱动的冷却水泵。该工厂有四个相同的立式冷却水泵,其中三个已运行,一个已备用。其中一个泵是蒸汽轮机驱动的,另外三个泵是电动机驱动的。自1982年安装以来,蒸汽轮机驱动的泵在过去的24年中一直表现不佳,平均故障间隔时间(MTBF)约为1个月,而电动机驱动的冷却水泵的MTBF为60个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号