首页> 外文期刊>World Oil >Just-in-time permitting tops GEST hit list
【24h】

Just-in-time permitting tops GEST hit list

机译:即时准入GEST热门排行榜

获取原文
获取原文并翻译 | 示例
           

摘要

While the pace of drilling authorizations is accelerating, all too often operators still find themselves sitting on the edge of their desks, awaiting the go-ahead before a contracted deepwater rig can begin paying for itself, according to the grassroots Gulf Economic Survival Team (GEST). What it terms "just-in-time" permitting is one of the key regulatory issues the Thibodaux, La.-based GEST has in its crosshairs, as it continues to lobby federal agencies to infuse more "predictability and clarity" into the game plan they continue to develop for the deepwater Gulf of Mexico, says Executive Director Lori LeBlanc. On the flip side, the waiting time to get a plan approved, which is required before a drilling permit is issued, has been cut nearly in half over the past year, she said.
机译:根据草根的海湾经济生存小组(GEST)的说法,尽管钻井许可的步伐正在加快,但操作员仍然经常发现自己坐在办公桌旁,等待签约的深水钻机开始收回成本。 )。它所谓的“及时”许可是总部位于洛杉矶Thibodaux的GEST的主要监管问题之一,因为它继续游说联邦机构在游戏计划中注入更多的“可预测性和清晰度”执行董事Lori LeBlanc说,他们继续为墨西哥湾深水区开发。另一方面,在过去的一年中,获得钻探许可证所需的等待批准计划的时间已经缩短了近一半。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号