【24h】

MAIN ROADS WA

机译:主罗阿DS哇

获取原文
获取原文并翻译 | 示例
           

摘要

Reconstruction to primerseal stage of 19.59km of Marble Bar Road between Marble Bar townsite and Shaw River, Pilbara region, including construction of nine floodways and all other drainage associated with road construction: Brierty Contractors. Contract price 5,762,725.30 dollars. Completion September 2002.Provision of private plant with operator for the construction of an overlay and widening on Brookton Highway, Wheatbelt region: Crozzo's 24,400 dollars; CR & K Bonser 24,000 dollars; LR Archibald & Co 180,100 dollars; PHS 25,550 dollars; RBY Mouritz 32,075 dollars; Spiers Earthworks & Plant Hire 21,000 dollars; Brian Williams 27,808 dollars. Total 334,933 dollars.
机译:重建位于大理石酒吧市镇和皮尔巴拉地区邵河之间的大理石酒吧路19.59公里的底漆阶段,包括修建9条洪水道以及与道路建设有关的所有其他排水设施:不列颠承包商。合约价5,762,725.30美元。 2002年9月竣工。为私人运营商提供私人工厂,用于在Wheatbelt地区的Brookton高速公路上覆盖和拓宽覆盖面:Crozzo的价格为24,400美元; CR&K Bonser 24,000美元; LR Archibald&Co 180,100美元;小灵通25,550美元; RBY Mouritz 32,075美元; Spiers Earthworks&Plant Hire 21,000美元;布莱恩·威廉姆斯(Brian Williams)27,808美元。总计334,933美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号