...
首页> 外文期刊>Wiadomosci Gornicze >Identification and assessment of production plan execution risk in a mining company
【24h】

Identification and assessment of production plan execution risk in a mining company

机译:识别和评估采矿公司中的生产计划执行风险

获取原文
获取原文并翻译 | 示例

摘要

Production process in coal mining is planned in not completely explored, changeable mining-geological conditions. Changeable mining-geological conditions and disappointing technical-organisational systems result in that the production from a longwall is a random variable that can be characterised by average values and standard deflections as measure of dissipation of results around the average ones. From the Statistics point of view changeability coefficients could be used for describing of this changeability. The article defines multi-dimensional random variables, presents mathematical model of the problem and determines technical-organisational excess and risk of not realisation of the plan.
机译:煤炭开采的生产过程是在尚未完全探索,变化多端的采矿地质条件下规划的。多变的采矿地质条件和令人失望的技术组织系统导致长壁开采是一个随机变量,其特征可以是平均值和标准偏差,以衡量结果在平均值附近的耗散。从统计的观点来看,可变性系数可用于描述这种可变性。本文定义了多维随机变量,提出了问题的数学模型,并确定了技术组织过多和无法实现计划的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号