首页> 外文OA文献 >Assessment, Planning, and Execution Considerations for Conjunction Risk Assessment and Mitigation Operations
【2h】

Assessment, Planning, and Execution Considerations for Conjunction Risk Assessment and Mitigation Operations

机译:联合风险评估和缓解操作的评估,计划和执行注意事项

摘要

An operational Conjunction Assessment Risk Analysis (CARA) concept is the real-time process of assessing risk posed by close approaches and reacting to those risks if necessary. The most effective way to completely mitigate conjunction risk is to perform an avoidance maneuver. The NASA Goddard Space Flight Center has implemented a routine CARA process since 2005. Over this period, considerable experience has been gained and many lessons have been learned. This paper identifies and presents these experiences as general concepts in the description of the Conjunction Assessment, Flight Dynamics, and Flight Operations methodologies and processes. These general concepts will be tied together and will be exemplified through a case study of an actual high risk conjunction event for the Aura mission.
机译:操作性联合评估风险分析(CARA)概念是实时评估由紧密方法所构成的风险并在必要时对这些风险做出反应的实时过程。完全减轻连带风险的最有效方法是执行回避动作。自2005年以来,美国国家航空航天局(NASA)戈达德太空飞行中心已执行了常规的CARA流程。在此期间,我们获得了可观的经验,并且汲取了很多教训。本文确定并介绍了这些经验,作为对合流评估,飞行动力学以及飞行运行方法和过程的描述中的一般概念。这些一般概念将结合在一起,并通过对Aura任务的实际高风险联结事件进行案例研究来举例说明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号