首页> 外文期刊>Well servicing >How to Rebuild Workover Masts
【24h】

How to Rebuild Workover Masts

机译:如何重建修井桅杆

获取原文
获取原文并翻译 | 示例
           

摘要

Per API RP 4G (4th Ed., April 2012) an operating mast should be totally rebuilt every 10 years, or every 3,650 operating days. This rebuild includes removing the mast from the carrier, disassembling it, removing paint and scale to the extent necessary, and rebuilding the mast per the manufacturer's original specifications. This includes all required structural repairs. 4G includes instruction as to the minimum qualifications required for the individual in charge of the inspection, the welders performing the work, and the inspectors who check the quality of the welds. RP 4G Table 2 also gives suggested rejection criteria for repair items. All these are suggested as minimum only. API documents are not intended to be "how-to" manuals, but overall general guidelines and requirements.
机译:根据API RP 4G(第4版,2012年4月),应每10年或每3,650个工作日完全重建一次操作桅杆。改造包括从运输工具上卸下门架,拆卸门架,去除油漆和缩放至必要的程度,以及按照制造商的原始规格重建门架。这包括所有必需的结构维修。 4G包括有关负责检查的人员,执行工作的焊工和检查焊缝质量的检查员所需的最低资格的说明。 RP 4G表2还给出了维修项目的建议拒绝标准。所有这些建议仅作为最低要求。 API文档并非旨在作为“使用方法”手册,而是整体的通用准则和要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号