A 1.1 KM-LONG collector in Erndtebruck, Germany, and a connecting collector to a treatment plant 2.5 km away have already shown immense damage from high water infiltration, despite only being built in 1973. The infiltration flow had risen so much that a newly installed third pump could barely cope with the water volumes at peak times. Seeking a solution to this problem, both the economics of the method to be used as well as the direct investment costs were considered. A further condition was a guarantee of cost-effective long-term use of the pipeline. In this situation, the investment is depreciated over the 'effective' life and, therefore, reflects directly into the annual operation costs. This brought a quick decision to use the pipe-bursting method.
机译:尽管仅在1973年建成,但德国Erndtebruck的1.1 KM-LONG收集器和2.5公里外的污水处理厂的连接收集器已显示出由于高渗水而造成的巨大破坏。渗水流量上升得如此之快,以至于新安装了一个在高峰时段,第三台泵几乎无法应付水量。为了解决这个问题,既考虑了所用方法的经济性,也考虑了直接投资成本。另一个条件是保证长期有效使用该管道。在这种情况下,投资会在“有效”寿命内折旧,因此直接反映在年度运营成本中。这很快就决定使用爆管方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号