...
首页> 外文期刊>The Korea Metal Journal >Dongbu Steel Pushes Forward with On-line Gas Plant Construction for Change in Securing Gas
【24h】

Dongbu Steel Pushes Forward with On-line Gas Plant Construction for Change in Securing Gas

机译:东方钢铁推进天然气在线工厂建设以改变天然气安全

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Dongbu Steel, which is pushing forward with the construction of electric furnaces and hot-rolled coil (HR) mill at its Dangjin Plant, has decided to change its gas purchasing method. Getting out of the previous practices of steelmakers to directly invest and operate gas plants, Dongbu Steel is pushing ahead with the construction of an on-site gas plant that will be operated by a method of outsourcing a gas supplier in order to secure gas more efficiently. Dongbu Steel is expecting that it will be much helpful for an improvement in its productivity and cost reduction. Its on-site gas plant construction this time is expected to cost about 45 billion won.
机译:东方钢铁正在其当金工厂推进电炉和热轧卷材厂的建设,该公司已决定改变其燃气购买方式。东武钢铁公司摆脱了钢铁制造商以前直接投资和运营天然气厂的惯例,正在推进现场天然气厂的建设,该工厂将通过外包天然气供应商的方式来运营,以更有效地保护天然气。东武钢铁期望这将对提高生产率和降低成本大有帮助。这次的现场天然气工厂建设预计将耗资约450亿韩元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号