...
首页> 外文期刊>The Northern Miner. >Minto up and running, Wolverine awaits financing
【24h】

Minto up and running, Wolverine awaits financing

机译:Minto启动并运行,Wolverine等待融资

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Mineral exploration in the Yukon in 2007 continued its dramatic rise from the past few years, with an estimated 130 million dollars spent on the search for base and precious metals, and uranium. Exploration for gold held the largest share of exploration expenditures, with 29 percent; followed by zinc and copper, 23 percent each; silver, 10 percent; uranium, 8 percent; and tungsten, molybdenum, nickel and others totalled 8 percent. Mine development expenditures have also increased to an estimated total of 72 million dollars. The bulk of development dollars were spent on the Minto copper-gold mine, which went into commercial production in October and at the Wolverine zinc-silver deposit, where road work and camp construction were finished. Final development of the Wolverine poly-metallic deposit will begin once additional project financing is raised. The total Phase 1 development costs at Minto were 100.2 million dollars over two years - this was 2 percent above the feasibility study estimate of 98.1 million dollars.
机译:与过去几年相比,2007年育空地区的矿产勘探业务持续增长,估计用于寻找贱金属,贵金属和铀的费用为1.3亿美元。黄金勘探在勘探支出中所占比例最大,为29%。其次是锌和铜,各占23%;银,百分之十;铀8%;钨,钼,镍等占8%。矿山开发支出也增加到估计总额7 200万美元。大部分开发资金都花在了Minto铜金矿上,该矿已于10月投入商业生产,并在Wolverine锌银矿床完成了道路工程和营地建设。一旦筹集了额外的项目资金,金刚狼多金属矿床的最终开发将开始。 Minto在第一阶段的总开发成本在两年内为1.002亿美元-比可行性研究估计的9810万美元高出2%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号