首页> 外文期刊>工程科学:英文版 >Financing Capital-running of a Large Hydropower Project——10 years’ financing strategy practices in the Three Gorges Project
【24h】

Financing Capital-running of a Large Hydropower Project——10 years’ financing strategy practices in the Three Gorges Project

机译:大型水电项目的融资与资本运行 - 三峡工程中的10年融资策略与实践

获取原文
获取原文并翻译 | 示例
       

摘要

By summing up ten years’ decision making and practices in the Three Gorges Project(TGP)financing, this paper makes a thorough going analysis of the characteristics of financing and capital running in this large hydropower project. Meanwhile,the proposals are also presented in this paper for how to optimize the financing structure, lower the financing cost and set up a carrier for durative financing and capital running of this large hydropower project.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号