...
首页> 外文期刊>The Asia Miner >Lion One confirms further Tuvatu potential
【24h】

Lion One confirms further Tuvatu potential

机译:狮子一号进一步证实了图瓦图的潜力

获取原文
获取原文并翻译 | 示例
           

摘要

LION One Metals continues to confirm further resource potential and exploration upside at the Tuvatu Gold Project near Nadi on the island of Viti Levu in Fiji, while preparing for feasibility work and potential decision for a fast track to production. The company expected to complete metallurgical testing by the end of June with results expected during the current quarter.Lion One has confirmed the continuity of several of the principal gold bearing veins that comprise part of the Tuvatu deposit. Mapping along strike confirmed the Murau West 1 and the Murau West 3 veins continue an additional 870 and 1300 metres respectively from the principal Tuvatu resource area.
机译:LION One Metals继续在斐济维提岛(Viti Levu)纳迪(Nadi)附近的图瓦图金矿项目(Tuvatu Gold Project)中确认更多的资源潜力和勘探上行空间,同时为可行性工作和快速生产的潜在决策做准备。该公司预计将在6月底完成冶金测试,并有望在本季度获得结果。第一狮队已确认了组成图瓦图矿床的几条主要含金矿脉的连续性。沿罢工测图证实,Murau West 1和Murau West 3矿脉分别与主要图瓦图资源区分别相距870米和1300米。

著录项

  • 来源
    《The Asia Miner》 |2012年第4期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号