The Iona Gas Plant is located 4 km north-east of Port Campbell in Victoria. It is adjacent to the Otway Gas Plant and is connected to the nearby Minerva Gas Plant via the SEA Gas Pipeline. Construction and expansion history Construction on the plant at Iona was originally planned to have started in late 2000, but was brought forward following the Longford Gas crisis in September 1998. Construction began in November 1998 and was completed in stages through to April 2001. At that time it had a storage withdrawal capacity of 200 terajoules per day (TJ/d). First gas flowed from the facility on 6 July 1999.
展开▼