首页> 外文期刊>U.S. Coal Review >Patriot amends accounting for cost of water treatment plants, to restate earnings
【24h】

Patriot amends accounting for cost of water treatment plants, to restate earnings

机译:爱国者修改水处理厂的成本核算,以重述收益

获取原文
获取原文并翻译 | 示例
           

摘要

As a result of a routine review and subsequent comments by the SEC, Patriot Coal has restated previously issued consolidated financial statements for 2010 and 2011 to accrue a liability and recognize a loss for the estimated costs of installing two water treatment facilities, rather than record the cost of the two facilities as a capital expenditure.The accounting treatment related to the costs of installing the water treatment facilities "involves significant operational and accounting complexities," Patriot noted. Both water treatment facilities are anticipated to operate 30 years or more.
机译:由于美国证券交易委员会(SEC)进行了例行审查和后续评论,爱国者煤炭(Patriot Coal)重述了先前发布的2010年和2011年合并财务报表,以应计负债并确认安装两个水处理设施的估计成本损失,而不是记录该损失。 Patriot指出,与水处理设施安装成本相关的会计处理“涉及重大的运营和会计复杂性”。这两个水处理设施预计将运行30年或更长时间。

著录项

  • 来源
    《U.S. Coal Review》 |2012年第1907期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号