...
首页> 外文期刊>U.S. Coal Review >Illinois up: Foresight is in coal at Hillsboro, ramps up Sugar Camp #2 schedule
【24h】

Illinois up: Foresight is in coal at Hillsboro, ramps up Sugar Camp #2 schedule

机译:伊利诺伊州:远见卓识在希尔斯伯勒(Hillsboro)燃煤中,加快了2号糖营的时间表

获取原文
获取原文并翻译 | 示例
           

摘要

Foresight Energy, Chris Cline's Illinois Basin juggernaut, has achieved two significant milestones and is moving quickly on its longwall development plans, poised to be at a 30 million-ton annual run rate by sometime in 2013 and to have that level of annual production in place by 2014. Foresight's Hillsboro Energy mine hit the coal seam with its slope late in October and is in coal. It is prepared to mine development coal with continuous miners. Foresight also decided to proceed with a second longwall at its Sugar Camp operation.
机译:克里斯·克莱恩(Chris Cline)位于伊利诺伊州盆地的先行者Foresight Energy已经取得了两个重要的里程碑,并正在迅速实施长壁发展计划,该计划到2013年某个时候的年产量将达到3000万吨,并达到这一水平的年产量到2014年。Foresight的Hillsboro Energy煤矿在10月下旬以其斜坡撞到了煤层,目前在煤炭中。它准备与连续采矿者一起开采发展中的煤炭。 Foresight还决定在其Sugar Camp行动中继续使用第二个长墙。

著录项

  • 来源
    《U.S. Coal Review》 |2010年第1829期|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 煤矿开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号