首页> 外文期刊>Platform Oil & Gas Technology Review >Cargotec Supplies Two 10 Point MacGregor Mooring Systems for Two Offshore Pipe-Laying Heavy-Lift Offshore Construction Vessels
【24h】

Cargotec Supplies Two 10 Point MacGregor Mooring Systems for Two Offshore Pipe-Laying Heavy-Lift Offshore Construction Vessels

机译:Cargotec为两个海上铺设的重型起重海洋工程船提供两个10点MacGregor系泊系统

获取原文
获取原文并翻译 | 示例

摘要

Cargotec has received an order to supply a total of twenty 150 tonne electric MacGregor winches for two pipe-laying heavy-lift offshore construction vessels (N448 and N449) which are currently being constructed at Cosco (Nantong) Shipyard Co Ltd in China. The vessels are being built for Malaysian offshore installation and maintenance specialist, TL Offshore Sdn. Bhd., a wholly owned subsidiary of SapuraCrest Petroleum Bhd.Each MacGregor mooring system includes ten electric mooring winches, wire rope leading sheaves and accessories/The mooring winch system is designed to maintain its designed limit of movement in all anticipated sea and weather conditions," explains Ilpo Heikkila, Vice President for winches at Cargotec.
机译:Cargotec已收到一份订单,为两艘铺设管道的重型海上施工船(N448和N449)提供总计20吨150吨的MacGregor电动绞车,目前正在中国中远(南通)造船有限公司建造。这些船只是为马来西亚海上安装和维护专家TL Offshore Sdn。 SapuraCrest Petroleum Bhd的全资子公司。每个MacGregor系泊系统包括十个电动系泊绞车,钢丝绳导绳轮和配件/系泊绞车系统旨在在所有预期的海洋和天气条件下保持其设计的活动极限, ” Cargotec绞车副总裁Ilpo Heikkila解释说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号