首页> 外文期刊>Windpower monthly >Government aims high at 9.5GW wind by 2018
【24h】

Government aims high at 9.5GW wind by 2018

机译:政府计划到2018年实现9.5GW风电的高目标

获取原文
获取原文并翻译 | 示例

摘要

The Mexican government announced a wind plan in January aiming to triple online wind capacity to reach 9.5GW by 2018. While the country's sector is already on the road to meeting around a third of that target, it is nevertheless widely viewed as too ambitious. The announcement comes on the heels of a record year for wind development in Mexico, with more than 1GW of new capacity installed in 2014, and the cumulative total reaching nearly 2.6GW, according to Mexican Wind Energy Association Amdee. A further 732MW is presently under construction, with over 3GW in the pipeline.
机译:墨西哥政府在1月份宣布了一项风能计划,目标是到2018年将在线风能装机容量增加三倍,达到9.5吉瓦。尽管该国的部门已经在努力实现该目标的三分之一左右,但人们普遍认为它过于雄心勃勃。根据墨西哥风能协会​​Amdee的说法,这一宣布是在墨西哥风能发展创纪录的一年之后,2014年安装了超过1GW的新装机容量,累计总量达到了近2.6GW。目前尚在建设中的另外732MW,正在建设中的3GW以上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号