【24h】

Spudding plans off Australia

机译:计划在澳大利亚关闭

获取原文
获取原文并翻译 | 示例
       

摘要

US SUPERMAJOR ExxonMobil plans to spud an ultra-deepwa-ter well later this year in the offshore Gippsland basin off Victoria, Australia. Australia's National Offshore Petroleum & Safety Environmental Management Authority (Nopsema) confirmed last week it was assessing a revision to an earlier environment plan submitted by ExxonMobil for exploration drilling in Vic/P70. That environment plan originally covered the unsuccessful Baldfish-1 and Hairtai-1 gas exploration wells drilled last year, with the new environment plan now covering a third well, Sculpin-1. Sculpin-1 would be drilled in a water depth of 2300 metres late in the second or early in the third quarter over a period of 60 to 65 days.
机译:美国超级巨头埃克森美孚计划于今年晚些时候在澳大利亚维多利亚州附近的吉普斯兰(Gippsland)海上钻一口超深水井。澳大利亚国家海洋石油与安全环境管理局(Nopsema)上周证实,它正在评估埃克森美孚公司提交的较早的环境计划修订案,该计划将在Vic / P70上进行勘探钻探。该环境计划最初涵盖了去年钻探的不成功的Baldfish-1和Hairtai-1天然气勘探井,而新的环境计划现在涵盖了第三口井Sculpin-1。 Sculpin-1钻机将在第二季度末或第三季度初在2300米深的水深中钻探60至65天。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号