The bored tunnel option to replace the central waterfront section of Seattle's Alaskan Way viaduct and seawall has won backing by state and local political leaders in the latest twist in the saga but their recommendation will need legislative approvals. Backing for the approximately 2.7km long twin tube tunnel came as a surprise as the option had been left on the sidelines in the most recent cost analysis, which late last year produced a shortlist of only two surface alternatives. Construction of the tunnel is to begin in 2011 and the completed link be opened in 2015. The option is the longest construction period (5.5 years for major works) but, critically, it was the least disruptive overall for the city and businesses although its impact is on par with other options at the waterfront. Deep tunnelling would also allow more flexibility in the demolition schedule for the viaduct. In addition, the authorities cited environmental benefits, and improving bored tunnelling technology and economics, as having been important to their preference for the tunnel option. The estimated total cost of the bored tunnel and associated improvements works to improve the streets, waterfront and transit, and also for the cost of demolishing the viaduct on the SR99, is approximately US$4.24bn.
机译:取代西雅图阿拉斯加大道高架桥和海堤的中央海滨部分的无聊隧道方案在州政府的最新动向中赢得了州和地方政治领导人的支持,但他们的建议将需要立法批准。大约2.7公里长的双管隧道得到了支持,这令人感到惊讶,因为在最近的成本分析中,该方案一直被搁置在一边,去年末该分析仅列出了两种地面替代方案。隧道的建设将于2011年开始,完整的连接线将于2015年开放。该选项是最长的建设期(主要工程为5.5年),但至关重要的是,尽管其影响力最大,但对城市和企业的破坏性最小与滨水区的其他选择相当。深隧道也将为高架桥的拆除时间表提供更大的灵活性。此外,当局称环境利益,改善无聊的隧道技术和经济性对他们选择隧道的选择很重要。钻孔隧道及相关改善工程的总成本估计约为42.4亿美元,用于改善街道,滨水区和公交系统,以及拆除SR99高架桥的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号