...
首页> 外文期刊>Tunnels & tunnelling international >Warsaw extension awarded to Astaldi
【24h】

Warsaw extension awarded to Astaldi

机译:华沙扩展授予Astaldi

获取原文
获取原文并翻译 | 示例
           

摘要

The Astaldi Group has been awarded a EUR 209M (USD 228.75M) contract to extend Line 2 of the Warsaw metro in Poland, the group announced 2 November. This comes on the heels of Astaldi's construction of the same line's central section, work it completed in March. The new contract calls for the executive design and the construction of the route's eastern section for a total of approximately 3km, from the Dworzec Wilenski Station to the stabling tracks past Station C-18, featuring twin-tube tunnels and three stations. The tunnels are to be excavated using the two TBMs that have already been employed for the boring of the first section of the line, which allow the tunnels to be bored even as they are equipped for the passage of trains. The contract also calls for building the link with the line's central section, as well as the civil and railway systems, superstructure, and all related works. The works are planned to be completed in 36 months, beginning in early 2016.
机译:Astaldi集团于11月2日宣布,已获得一份2.09亿欧元(合2.8275亿美元)的合同,以扩大波兰华沙地铁的2号线。这是继Astaldi在同一条生产线中央部分的建设之后,该工作于三月份完成的。新合同要求执行设计和建设路线的东部,全长约3公里,从Dworzec Wilenski站到经过C-18站的稳定轨道,其中包括双管隧道和三个站。隧道将使用已经在线路第一部分的钻孔中使用的两个TBM进行开挖,即使在为列车通过而装备隧道的情况下,也允许对隧道进行钻孔。该合同还要求与线路中央部分以及民用和铁路系统,上层建筑以及所有相关工程建立连接。该工程计划于2016年初开始的36个月内完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号